I'm starting the bathroom remodel tomorrow. I will not be on here as much for a few days because I gotta push this to get it usable again.
We have a plumber coming at 8:30 tomorrow (Friday) to disconnect everything and cap the lines off (nothing has shutoffs now). When he's done, I'll start demolition and everything will go. Going to bust out the lath and plaster and start over with everyting new.
Here are some "before" shots. I'm almost embarrased to show these because this this room is so bad. After this, we just have the living room left and then everything will have been spruced up on the main floor.
Today, it looked like this:
Fabulous 1960's wallboard. I started to pull that off one day thinking that it might look beter without that and there is even worse looking brown wallboard behind the white stars.
The faucet is leaking a little and has caused the board to deteriorate around the tub. It looks like mold, but it is that dark "Masonite" stuff falling apart.
It is a really small room.
Our wonderful light fixture. The origional must have gone bad at some time so they put a smaller flourescent fixture inside the origional one. It was shorter so the ends are filled with pieces of cardboard and covered with contact paper. The light is wired in the wall with lamp cord. The only single outlet in the batroom is in the other end of this light.
I'm hoping to get this room completely gutted tomorrow. The window will be filled in because we are going to make it a shower now too. Now, we just have a single stall shower in the basement.
We do have a toilet, sink, and the shower in the basement so we won't be without facilities, but I'll need to get this working again ASAP. My wife hates the basement.